Guinea Simandou Iron Ore Mine – Mining Project

微信图片_20251116173721_218_82.png
DJI_20251116145959_0558_D.JPG
DJI_20251116145927_0556_D.JPG
DJI_20251116145443_0552_D.JPG
微信图片_20251116173721_218_82.png
DJI_20251116145959_0558_D.JPG
DJI_20251116145927_0556_D.JPG
DJI_20251116145443_0552_D.JPG

Overview

Our company is responsible for the design, manufacturing, and technical services for the Package 3 belt conveyor system, which includes 12 belt conveyors with belt widths of 2,000 mm and 2,400 mm, along with 10 transfer stations, totaling approximately 13.1 kilometers in length.

The system adopts an elevated layout and is driven by permanent magnet motors. It integrates intelligent control, inspection robots, and dust removal devices.

The project is implemented in two phases. Phase I, comprising 6 conveyors, completed port delivery in December 2024 and achieved heavy-load commissioning in May 2025. Phase II is scheduled for full operation in July 2026, with a designed annual production capacity of 120 million metric tons.

Apply for accessories

Accessory Name

Application Scenarios: mine; build;

Company*
Address
Name*
Email*
Number*
Code*

Your information is being protected.

I want this job

Name*
Email*
Number*
Resume*
Message
Code*

Your information is being protected.

Our page uses Cookies

We use cookies to personalize and enhance your browsing experience on our website. By clicking "Accept All", you agree to use cookies. You can read our Cookie Policy for more information.